Basket and login details

Audrey Seguy Basket: £5 (1 item)   Sign out

User login

We're re-developing the Mezz! This bouldering area will be closed until the end of the month. During this time there will be some disruption while we carry out works. This will be kept to a minimum and the majority of work will occur during our off-peak hours.

 

Title

Floor 3 - The Loft

Floor 3 was the gantry floor of the pumping station and until recently it had openings in the floor where the flywheels of the engines used to protrude. The gantry level enabled the workers to maintain the flywheels from above. The Loft space has been developed in 2013 and now consists of a 16m long bouldering wall and 4m high free standing boulder in this light and airy space in the roof of the Castle.