Basket and login details

Audrey Seguy Basket: £5 (1 item)   Sign out

User login

 

Title

Floor 3 - The Loft

Floor 3 was the gantry floor of the pumping station and until recently it had openings in the floor where the flywheels of the engines used to protrude. The gantry level enabled the workers to maintain the flywheels from above. The Loft space has been developed in 2013 and now consists of a 16m long bouldering wall and 4m high free standing boulder in this light and airy space in the roof of the Castle.